Status of the NEW EAST & WEST Wastewater Treatment Facilities

Status of the NEW EAST & WEST Wastewater Treatment Facilities

The City of Winter Springs is currently seeking qualified consultants to design a 1.5 MGD or larger domestic wastewater treatment facilities. 

This company will have experience in the design of Biological Nutrient Removal (BNR) domestic wastewater treatment techniques , experience with permitting Water Reclamation Facilities (WRF), WRF disposal, and collection and transmission systems within the Central District of FDEP

The East wastewater plant was constructed in the mid 1970’s, and is comprised of two separate package treatment plants (circular field erected steel tanks) originally designed to use an activated sludge process, either as conventional treatment or contact stabilization.

The facility is permitted for a flow of 2.012 MGD average annual daily flow (AADF) but currently experiences flows of approximately half this capacity.

The City wants to replace this facility and design and build a treatment plant that is “right-sized” at 1.5 MGD BNR facility.

The West Wastewater plant was constructed in the late 1980’s, and is comprised of two separate package treatment plants (circular field erected steel tanks) originally designed to use an activated sludge process, either as convention treatment or contact stabilization.

The facility is permitted for a flow of 2.07 MGD AADF but currently experiences flows approximately half this capacity.

The City wants to replace this facility and design and build a treatment plant that is “right-sized” at 1.5 MGD BNR Facility.

Leave a Reply

Your email address will not be published. Required fields are marked *